Ten checks to run before a renovation quotation leaves your office, so scope gaps and pricing slips do not turn into unpaid work later.

A quotation is the only document most clients read closely, and it is where a job's profit is decided. Once it is signed, everything the quote left out becomes an argument — or unpaid work.

This is the checklist to run before one leaves your office.

1. Every area has a scope, not a label

"Master bedroom — carpentry" is a label. A scope says what is being built, where, in what material, and how much of it. If a line cannot be measured by whoever will do the work, it is not ready to price.

2. Quantities carry units

Feet run, square feet, per point, per set, per trip. A quantity without a unit is the fastest way to argue later about whether a price covered one wardrobe or three.

3. The price comes from your rate card, not from memory

Pricing from memory is how the same item goes out at different prices from two people in the same office. Keep one rate card, price from it, and treat anything priced outside it as a decision that needs a reason.

4. Hidden work is priced, not assumed

Hacking, protection, disposal, hoisting, after-hours access, and making good. These are real costs that rarely appear in a client's mental picture of the job. Price them as lines the client can see.

5. Exclusions are written down

Say what is not included: appliances, loose furniture, permits, authority submissions, works by other trades. An exclusions list is not defensive; it is the cheapest insurance in the document.

6. Assumptions are stated

Access hours, existing wiring condition, floor levels, whether the unit is handed over bare. When an assumption turns out to be wrong on site, a written assumption turns an argument into a variation order.

7. Provisional sums are labelled as such

If an item cannot be fixed yet, label it provisional and say what will settle it. Clients accept provisional sums. What they do not accept is a number they thought was final quietly rising.

8. Payment stages match site milestones

Tie each payment to something visible: signing, commencement, completion of a trade, handover. A stage tied to a date instead of a milestone will slip, and the payment will slip with it.

9. The variation process is on the document

One short paragraph: changes are quoted before work starts, and signed. Clients rarely object at quoting time. They object when the first change arrives without a process.

10. Someone else reads it before it goes

The best check is a second pair of eyes on the totals, the exclusions and the spelling of the client's name. If your firm sends more quotes than one person can review, the review needs to be part of the system rather than a favour.

Where the time actually goes

Most firms do not lose time writing prices. They lose it rebuilding the same scope from scratch for every job, then checking it by hand. A rate card the whole team shares, plus quotations built from it, turns this checklist from ten manual steps into two or three.

That is the job EnQuote's quotation builder does: one rate card, quotations built from it, and margins visible while you price rather than after the job.

Common questions

What should a renovation quotation always include?

Scope by area, quantities with units, exclusions, the assumptions behind the price, payment stages, validity period and what happens when the client changes their mind. The exclusions and assumptions matter as much as the prices.

How long should a renovation quotation stay valid?

Long enough for the client to decide, short enough that material prices have not moved. Many firms use two to four weeks and state the date on the document.